Case Studies

Where ALIMATS® crane mats and Stacker Packers levelling shims have been specified on real projects — in the UK and internationally

Project experience

Filter by product line

ALIMATS International Deployments
ALIMATS®Oil and Gas / Logistics

ALIMATS International Deployments

We manufacture ALIMATS in Derbyshire and ship them well beyond the UK. Two of those orders have crossed continents already — one to an offshore oil and gas company in Qatar, another to an integrated logistics company in Angola — and the overseas enquiries keep coming.

Read the case study
ALIMATS at Heathrow and Gatwick
ALIMATS®Aviation

ALIMATS at Heathrow and Gatwick

Our ALIMATS crane mats have been specified on projects at both Heathrow and Gatwick — the UK's two largest airports, and two of the busiest live aviation hubs in Europe. Here is why a modular, independently verified aluminium system suits the ground on a working airport.

Read the case study
ALIMATS on Hinkley Point C
ALIMATS®Nuclear

ALIMATS on Hinkley Point C

ALIMATS has been named on Hinkley Point C, the UK's first new nuclear power station in a generation. Here is why a programme built to that level of scrutiny specifies ground protection like ours.

Read the case study
ALIMATS on HS2
ALIMATS®Rail

ALIMATS on HS2

We've been named on HS2, the UK's new high-speed rail line — our modular aluminium crane mat system, built for the tight corridors, constant moves and hard scrutiny that major rail work demands.

Read the case study